Please CLICK HERE to access AER Bulletin 2023-31, outlining details of the 2024 industry-wide mandatory spend under the Inventory Reduction Program (described in Directive 088: Licensee Life-Cycle Management). Licensee-specific mandatory closure spend for 2024 will be visible by September 28th within OneStop.
![](https://360eec.com/wp-content/uploads/2023/09/development-of-site-specific-guidelines-and-remdial-action-plan-1920x1440.jpg)
Development of Site-Specific Guidelines & Remedial Action Plan (RAP)
Working closely with a developer, the City planning group, the AER, and the oil and gas licensee, 360 evaluated and remediated a contaminated site within the City of Edmonton that was slated for future residential development. Subject matter experts from 360 delineated the site extensively over 3 years and created an advanced environmental model that reduced the excavation volumes while saving our Client >$3 MM. Subsequently, the site fully meets environmental guidelines, and our client’s bottom line was protected.