We are setting the scissors aside and growing sweet mullets to raise money to benefit The Canadian Mental Health Association. The past year has been a challenging one for mental health. Whether it is caused by stress at home or work, a head injury from sports or an accident, or a pre-existing condition, 1 in 5 Canadian personally experience a mental health problem or illness. Any donation will help make an impact, thank you in advance for your contribution to this cause that means so much to us at 360! DONATE HERE

Jericho Diamond Mine Site Stabilization
Jericho is an abandoned open pit diamond mine located in Nunavut, approximately 420km northeast of Yellowknife. Outcome, in joint venture with Rowe’s Construction Ltd., was awarded the contract to mobilize all requisite heavy equipment, remote camp, and materials for the breaching three existing dams to restore previously natural water flow, grading and installing a cover over the existing tailings containment area, decommissioning above-ground storage tanks and structures, constructing an on-site lined containment facility for non-hazardous wastes, and consolidating hazardous material for off-site disposal.
Outcome created certainty for the owner by submitting a tender with a comprehensive mobilization plan which was carefully integrated with the construction plan. The regulatory approvals were quickly secured and the team overcame the structure demolition and frozen-core dam decommissioning challenges such that the project was completed within the tight six-month contract time constraint and slightly under the original tendered contract price.