360 is excited to be featured in an article on reducing time to site closure on remote boreal forest sites, resulting in cost savings and minimizing environmental impact. Click HERE read the full article which begins on page 78.
Public Infrastructure Project
During a public infrastructure construction project, an undocumented wellbore emitting methane and H₂S gas was discovered. 360 developed a detailed work plan to address the issue, including re-entry of the wellbore and installation of a cement plug to eliminate gas emissions. Our team successfully resolved the issue, ensuring the safety of the site and allowing construction to resume.