Keep it Simple, Scientists: The Benefits of Applying Risk Principles to Simple Sites

In the realm of environmental site assessment, it’s often the complexity of the task that can confound even the most experienced scientists. However, what’s sometimes overlooked is the potential for simplicity, and the benefits that come with applying risk-based principles to sites and their associated data. This is particularly relevant when dealing with seemingly straightforward sites that could hold hidden environmental risks.

Consider a scenario where a simple site is approached using two different methods. The first approach, Method 1, treats the site as a regular Tier 1 site, assuming that groundwater is not impacted. This method involves characterizing and delineating the potential environmental concerns (APECs) using minimal resources – two background boreholes and a focus on chloride. This approach is not only simpler but also significantly more cost-effective, with an estimated expense of $8,000 to $12,000.

In contrast, Method 2 approaches the same site with a risk perspective, aiming to comprehensively delineate APECs. This entails six background boreholes, more intensive sampling, including texture analysis and the use of Shelby tubes. The focus remains on chloride, but the approach is more detailed, with a minimum of four boreholes per APEC and additional deep boreholes for a dual-unit aquifer buffer. The cost, as expected, rises to approximately $17,000 to $20,000.

The initial planning of these approaches involves identifying key factors, including groundwater receptors, freshwater aquatic life, livestock and irrigation, and drinking water sources. Notably, the Tier 1 approach makes certain assumptions about freshwater aquatic life and specifies that it is 10 meters away from impacts. A crucial part of the risk-based approach is identifying all water bodies capable of supporting an aquatic ecosystem within 1000 meters and considering the potential exclusion of pathways for specific contaminants, depending on their distance from aquatic ecosystems.

The term “chlorides” is likened to a “swear word” in the offices of oil and gas companies in Western Canada. This is due to the challenging yet essential nature of delineating chlorides in soil to meet the lowest applicable guideline. Often, this requirement is overlooked or misunderstood in basic Phase 2 assessments. Neglecting this aspect can lead to regulatory rejection or unnecessary over-excision of salt-impacted soils. Scientists need to consider natural versus anthropogenic sources of chlorides and the depth of their impact on groundwater.

When it comes to Phase 2 sampling with Tier 2 in mind, specific requirements for soil texture, deeper boreholes, and lateral and vertical delineation must be addressed. The use of Shelby tubes is highlighted as a valuable tool, particularly for isolating geologic units with low hydraulic conductivity.

Moreover, the Native Prairie Protocol (NPP)* is emphasized as a key element for sites with soil salinity exceeding Tier 1 guidelines. It provides a framework to demonstrate that no adverse effects will occur to the plant community and groundwater resources, deeper than 2 meters.

One of the intriguing aspects discussed is the need for monitoring wells. While freshwater aquatic life (FAL) and the dual-unit aquifer (DUA) guidelines can be constraining, the data and borehole logs can be leveraged effectively to determine the depth to groundwater, sulfate concentrations in soil, and the presence of coarse intervals in saturation data.

In summary, the insight gained from this comparison is clear: simplifying environmental site assessment by adopting a risk-based approach has the potential to deliver substantial savings on remediation costs while maintaining a rigorous commitment to environmental safety and compliance. It underscores the importance of data, expertise, and careful consideration of site-specific factors in environmental science and consultancy.

Thank you for reading,


Lori Vickerman
Technical Manager, Risk Assessment

For more information, check out Lori’s full presentation which was presented at this year’s ESAA RemTech Symposium.




*Native Prairie Protocol (NPP)

Recent Insights

  • Unlocking Success in Federally Funded Site Closure Programs: Key Insights from Diverse Experiences

    Since 2019, federally funded upstream site closure programs have become a key avenue for North American administrations to improve environmental quality, create jobs, and support underutilized businesses. Our team became involved in these projects early on and has since participated in federally funded initiatives across seven different states and provinces. This diverse experience has allowed…

    Read More

  • Building Foundations: Canada’s Site Closure Success and Global Outlook

    It’s become a tradition to write a year-end recap in December, reflecting on key industry topics and challenges surrounding site restoration and closure in the energy sector. This year, we’re continuing that theme while expanding to broader topics with a forward-looking perspective. Policy, Regulation, and Industry Trends 2024 has been a steady year for site…

    Read More

  • Leading the Way: Shaping the Future of Environmental Regulatory Compliance

    Industry collaboration is key to addressing the ever-evolving challenges of environmental regulation, particularly in sectors as complex and impactful as oil and gas. Roundtable discussions and forums provide valuable opportunities for stakeholders to come together, exchange insights, and develop collective strategies for navigating regulatory changes. By sharing experiences, concerns, and best practices, these collaborations ensure…

    Read More

  • Turn up the good, Turn down the suck!

    Those local to the Calgary area are likely familiar with this quote from the movie FUBAR that was filmed in and around the city back in 2002. Deaner, the quoted actor, remains somewhat a local celebrity to this day for this quote (and several others from the original movie and its sequel). Anyone who has…

    Read More